Objective function #4
Unanswered
Mostafa494
asked this question in
Q&A
Replies: 2 comments 3 replies
-
|
Thanks! As I responded to the original question, the objective function is actually the hourly production costs. Please, check this example script to estimate production costs at hourly and annual scales. |
Beta Was this translation helpful? Give feedback.
3 replies
-
|
Dear Dr. Kamal,
Thank you for your help.
Actually I do not have hourly load data for each node (bus), So Is there is a way that I could define a hourly load pattern as a total and not for each node ( as I have a lack of data in this area for excel sheet data_load).
Regards
Mostafa Hasaneen
Technical Studies Engineer
Energy Efficiency & Climate Change Department (EEACC)
The Egyptian Ministry of Electricity & Renewable Energy
…________________________________
From: AFM Kamal Chowdhury ***@***.***>
Sent: Tuesday, March 9, 2021 2:43 AM
To: kamal0013/PowNet ***@***.***>
Cc: Mostafa494 ***@***.***>; Author ***@***.***>
Subject: Re: [kamal0013/PowNet] Objective function (#4)
Sure, the Thailand model and data are available here<https://github.com/kamal0013/PowNet-Thailand>.
—
You are receiving this because you authored the thread.
Reply to this email directly, view it on GitHub<#4 (reply in thread)>, or unsubscribe<https://github.com/notifications/unsubscribe-auth/ASC4MK7AGL6SMVLUVUFBJIDTCVVJLANCNFSM4YXRQ6XA>.
|
Beta Was this translation helpful? Give feedback.
0 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
-
Dear Sir,
Thank you for your efforts.
Kindly guide me how to extract the objective function values so as to compare the results with other techniques, I have read the code and run all attached files, however the results do not include the obj function result.
Regards
Beta Was this translation helpful? Give feedback.
All reactions