Background
This issue packages all formal outputs required for project acceptance.
Scope
- Compile final report and final acceptance report.
- Prepare paper materials and patent materials.
- Produce benchmark summaries aligned with the contract metrics.
Deliverables
- Final report and final acceptance report.
- Performance summary tables and critical logs.
- One CCF-A paper manuscript plus acceptance evidence when available.
- Two patent application packages, application numbers, and supporting materials.
- Reproduction guide.
Acceptance Criteria
- Successful midterm and final acceptance.
- GPU/NPU VRAM utilization >90% in target scenarios.
- End-to-end inference cost reduced by >70%.
- P95 latency reduced by >20% and SLO violation rate reduced by >30%.
- Archive includes the required paper and patent evidence.
Dependencies
Notes
This is the final packaging issue for the sponsor-facing deliverables.
Background
This issue packages all formal outputs required for project acceptance.
Scope
Deliverables
Acceptance Criteria
Dependencies
Notes
This is the final packaging issue for the sponsor-facing deliverables.