fix(cli): close follow-up gaps (#7137) #28626
ci.yml
on: push
Detect Version
6s
Migrate Dev DB
/
Apply Database Migrations
Detect Desktop Changes
13s
Matrix: Build AMD64
Matrix: Build ARM64 (GHCR Only)
Test and Build
/
Lint and Test
4m 27s
Test and Build
/
Build App
2m 55s
Check Docs Changes
Matrix: Build Dev ECR
Deploy Trigger.dev (Dev)
Matrix: Create GHCR Manifests
Process Docs
/
Process Documentation Embeddings
Prune Desktop Prereleases
0s
Desktop Release
/
Build, Sign, Notarize
Annotations
3 errors and 9 warnings
|
Test and Build / Lint and Test
Process completed with exit code 137.
|
|
Test and Build / Lint and Test
@sim/app#test: command (/home/runner/_work/sim/sim/apps/sim) /home/runner/.bun/bin/bun run test exited (137)
|
|
Test and Build / Lint and Test
Process completed with exit code 1.
|
|
Test and Build / Lint and Test
Skipping sticky disk commit due to previous step failures
|
|
Test and Build / Lint and Test
- Step: unknown (failed)
|
|
Test and Build / Lint and Test
Found 2 failed/cancelled steps in previous workflow steps
|
|
Test and Build / Lint and Test
Skipping sticky disk commit due to previous step failures
|
|
Test and Build / Lint and Test
- Step: unknown (failed)
|
|
Test and Build / Lint and Test
Found 2 failed/cancelled steps in previous workflow steps
|
|
Test and Build / Lint and Test
Skipping sticky disk commit due to previous step failures
|
|
Test and Build / Lint and Test
- Step: unknown (failed)
|
|
Test and Build / Lint and Test
Found 2 failed/cancelled steps in previous workflow steps
|