Clean repository docs and fix exploratory archive (v0.1.2)#2
Open
Mythmaker28 wants to merge 1 commit into
Open
Clean repository docs and fix exploratory archive (v0.1.2)#2Mythmaker28 wants to merge 1 commit into
Mythmaker28 wants to merge 1 commit into
Conversation
Mythmaker28
pushed a commit
that referenced
this pull request
May 6, 2026
…ernal): 5 cells from v0.1.2 hold-out (Q15A, Q16A, Q14A, Q12B, Q13B) with IR+Logician consensus reference; flagged-cell exclusion on Q14A D1+D5 Per CEO authorization in comment ce1ae02a. UD-internal until DOD #2 fires (H2 sourced + consented + declared on AOV-163). No git push of these two files until canonical-scribe gate clears post-Phase-3.5. Calibration coverage: strong on D1, D2, D4, D6 (clean consensus positives). Gaps: D3, D5-positive, D7/D8-positive, #7 MEMORY-vs-#8 NOSRC distinction (extension pack from primary Q1-Q10 may be needed; UD will surface to CEO if H2 panel reliability requires it).
Mythmaker28
pushed a commit
that referenced
this pull request
May 6, 2026
- Mod 1 (textual): added top-level Source line to Part B item 3 for format consistency with items 1/2/4/5/6/10. Cites sprint-1 §4 item 4(a) (results doc :198) + §3.3 slippage rows #2/#7/#9/#15 — broader UR-5 cluster the rule addresses. - Mod 2 (substantive): added INTERPRET as third eligible marker for the framework-prescription claim in Part A item 4. Wording: BELIEF (defended) / NOSRC (held without cite) / INTERPRET (one reading among others). Worked example added: "[INTERPRET] On Save the Cat's reading, midpoints function to escalate stakes — one reading of how the beat is meant to work, not a universal prescription." - Soft preference: FACT-row caveat now cross-references item 10 — CONF stacks legitimately on the BELIEF or INTERPRET form; CONF on the existence-FACT is redundant per slippage rule 10. - Mirrored Mod 2 + soft preference into Part E POST-PATCH ARTIFACT 1 (slippage bullet 8 + FACT-row caveat). - Updated top status line + Part E status + audit checklist coverage rows for items 3 + 4 to record Mod fold + verdict provenance (c9cf09c4). Per feedback_audit_fold_cross_assignee_cycle, fold-confirm goes on AOV-112 (parent), not on closed AOV-116. Next: push Part E POST-PATCH text to docs/usability_sprint1.md lines 12-72; PATCH AOV-112 → done.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Applies AOV-15 board corrections to public docs + bumps protocol to v0.1.2.
README.md,AGENTS.md,DECISIONS.md,docs/archive_exploratoire.md.AOVEN_PROTOCOL_v0.1.mdheader + changelog to v0.1.2; markdown readability pass (decision log → per-decision blocks); no semantic change to markers (14), formats, Usage Rules, anti-slippage table (13 transitions), or D1–D3 / D5–D8 verdicts.Audit trail
0faaeaef), shipped 5 files at project-root paths.SIGNED-OFF. All five checks pass: deliverable complete, NOSRC discipline (verbatim board origin, no asserted-claim residue), scope discipline, bump correctness, no new claims without source.Clean repository docs and fix exploratory archive— exact board-specified text on AOV-15.Deviation note for board
AOV-17 description specified "add the commit to PR #1". PR #1 was already merged at 2026-04-26T02:57:28Z (before AOV-17 was created at 03:05:45Z). "Add to PR #1" therefore wasn't possible. Two options remained: push direct to
main, or open a new scoped PR. Opted for the latter to preserve audit surface and conform to the original branching policy ("non-empty repo → branch + PR"). CEO can revise this call by collapsing the PR if direct-to-main was preferred — content would not change.Test plan
git diff origin/main...HEAD --statshows exactly 5 files changed.grep -c \"AOV-12b pending\|<!-- placeholder\"returns 0 across all 5 files.v0.1.2present in spec header + changelog; D9 row present in spec + DECISIONS.md.— CTO (e8587a99)