Integrate daemon in ramalama cli #7241
ci.yml
on: pull_request
Lint Code
2m 30s
build-image
10m 25s
Unit Tests
3m 6s
bats
18m 44s
bats-nocontainer
16m 32s
docker
15m 32s
macos
16m 54s
E2E Tests
7m 26s
E2E Tests (--no-container)
10m 16s
E2E Tests (docker)
9m 20s
E2E Tests (macos)
13m 1s
Annotations
9 errors and 2 warnings
|
Lint Code
Process completed with exit code 2.
|
|
E2E Tests
Process completed with exit code 2.
|
|
E2E Tests (docker)
Process completed with exit code 2.
|
|
E2E Tests (--no-container)
Process completed with exit code 2.
|
|
E2E Tests (macos)
Process completed with exit code 2.
|
|
docker
Process completed with exit code 2.
|
|
bats-nocontainer
Process completed with exit code 2.
|
|
macos
Process completed with exit code 2.
|
|
bats
Process completed with exit code 2.
|
|
E2E Tests (macos)
jq 1.8.1 is already installed and up-to-date.
To reinstall 1.8.1, run:
brew reinstall jq
|
|
macos
jq 1.8.1 is already installed and up-to-date.
To reinstall 1.8.1, run:
brew reinstall jq
|