Skip to content

docs: record rc9 production governance rollout - #3

Draft
evergardener wants to merge 2 commits into
mainfrom
codex/rc9-production-record
Draft

docs: record rc9 production governance rollout#3
evergardener wants to merge 2 commits into
mainfrom
codex/rc9-production-record

Conversation

@evergardener

Copy link
Copy Markdown
Owner

What changed

  • update the handoff baseline to the deployed rc.9 immutable revision
  • record the authorized H5 production apply and idempotent replay evidence
  • record the pre/post restore-verified backups, Hermes read-only UAT, and remaining review items
  • preserve the distinction between runtime PASS and the existing DEGRADED quality status

Why

The source documents still described the pre-authorization rc.8 state after rc.9 was published and deployed. This PR aligns the durable handoff and governance reports with the verified production state without changing runtime code.

Validation

  • production runtime Gate: PASS
  • H5 apply: 36 governed, 22 evidence merged, candidates 38 to 2
  • idempotent replay: already applied, zero writes
  • restore verification and Vault roundtrip: PASS before and after H5
  • Hermes jiuyue browse, recall, and trace: PASS
  • front-end login page load and console check: PASS
  • documentation diff check: PASS

Remaining boundaries

  • do not replay the three existing failed jobs without separate authorization
  • do not decide the two retained review items automatically
  • do not promote beyond canary_active from this documentation PR

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant